top of page
MicrosoftTeams-image (3).png

Quai de Grenelle Givry

Mission: Offices
Label: HQE bâtiment durable, BBCA rénovation, Effinergie rénovation, Plan climat de la ville de Paris, Paris Pluie, Plan bioclimatique de la ville de Paris
Client: SemPariSeine
Architects: &Girvy
Delivery: 2022
Location: 55 quai de grenelle 75015 Paris

woodwork_nb.jpg

Woodwork

Mission: Supply of 8,500 m² of flooring slabs
Equivalence: 680 tonnes of CO2 saved and 236 tonnes of waste avoided
Label: E+C-
Client: Woodeum
Architects: Nicolas Laisné and Dimitri Roussel
Delivery: 2021
Location :Saint-Denis (93200)

Références
Consulting
Production
quai de grenelle renault_edited.jpg

Quai de Grenelle Renault

Mission: renovation of 5,949m² of housing units and 1,360m² of business premises
Label: NF habitat HQE certification, excellent grade, with a circular economy profile, BBC effinergie renovation
Client: CAPELLI-Immobilier
Architects: Archikubik
Delivery: June 2024
Location: 29 Quai de Grenelle, 75015 Paris

Kanal nb.jpg

Kanal

Mission: Supply of 16,500 m² of flooring slabs
Equivalence:1,320 tonnes of CO2 saved and 460 tonnes of waste avoided
Label: E+C- level E1C1
Client: Bouygues Bâtiment île-de-France private construction
Architects: Rudy Ricciotti
Delivery: 2021
Location: Pantin (93500)

3 COLLEGES DU 93b_edited.jpg

AMO Lycées IDF

Project owner: Ile-de-France (Greater Paris) region
Program: Restructuring of IDF (Greater Paris Area) high schools (East lot)
Location: 93, 94, 91 & 77
Mission: Reuse project owner support: resource diagnosis, conservation master plan, monitoring of various project management plans, site tracking, social and environmental reports

PULSE.jpg

Pulse

Mission: Supply of 21,800 m² of flooring slabs and 220 ml of handrails

Client: ICADE

Delivery: 2018

Location: Saint-Denis

Program: Commercial

Phase: Execution

IMG_0561_edited.jpg

Buttes Chaumont

Mission: Materials reuse project management, resource diagnosis, conservation master plan, off-site materials sourcing, site tracking, social and environmental assessment.

Surface area:5,000 m²

Client: IMMOBEL
Architect: Armand Nouvet architecture & Givry architectes

Delivery: 2023
Location: Paris 19th arrondissement
Certification: NF HQE

Program: Demolition + housing construction

green oak détail nb.jpg

Green Oak

Mission: Supply of 7,850 m² of flooring slabs
Equivalence:628 tonnes of CO2 saved and 218 tonnes of waste avoided
Client: Kaufman Broad
Architects: MootzPelé et Calq
Delivery: 2021
Location: Arcueil
Program: Offices

Lycée Henri Becquerel Nangis_edited.jpg

Henri Becquerel School, Nangis

Restructuring of IDF (Greater Paris Area) high schools (East lot)

Mission: Reuse project owner support:resource diagnostics, conservation master plan, monitoring of various project management plans, site tracking, social and environmental reports
Client: Ile-de-France (Greater Paris) region
Architect: Colboc Sachet architectures

Delivery: 2024
Location: 1, boulevard Henri Rousselle, Nangis (77)
Surface area: 7,000 m²
Certification: Targeted E3C1

Program: Teaching

EUREKA.jpg

Euréka

Mission: Supply of 5,300 m² of flooring slabs

Client: Bouygues construction

Delivery: 2019

Location: Paris

Program: Offices

Phase: Execution

HAUSSMANN nb.jpg

Haussmann

Mission: materials recovery plan for the existing building
Client: Lazard Frères Banque 
Architects: DTACC architects
Delivery: 2022
Location: Paris (75008)
Program: Offices

av charles de gaulle_edited.jpg

Avenue Charles-de-Gaulle

Mission: Supply of 7,800 m² of flooring slabs

Equivalence: 134 tonnes of CO2 saved and 210 tonnes of waste avoided

Client: BNP Paribas

Architect: Arte Charpentier Architectes

Delivery: 2021

Location: Neuilly-sur-Seine

Program: Offices

svp_ref.jpg

ZAC Saint Vincent de Paul

Mission: Reuse project management support (Resource diagnosis / Master plan / Setting targets for the project management group in terms of reuse / Follow up of removal work)
Client: Paris Métropole Aménagement
Delivery:2024
Location: Paris (75014)
Program: Housing, shops and equipment

macif_edited.jpg

Macif head office

Mission: Supply of 2,900 m² of flooring slabs

Equivalence: 58 tonnes of CO2 saved and 95 tonnes of waste avoided

Client: Frère SAS

Architect: J.M Dresse-Architecte D.P.LG

Delivery: 2021

Location: Niort

Program: Offices

hopital avicenne_edited.jpg

Avicenne

Mission: Project management of the reuse of materials: waste diagnosis, resource diagnosis with master plan track.

Client: APHP
Demolition project management: Safège
Location: Bobigny
Surface area: 3,000 m²

Program: Hospital

ilot fertile eole evangile_edited.jpg

Ilot Fertile - Eole Evangile

Mission: Supply of 6,250 m² of flooring slabs

Equivalence: 125 tonnes of CO2 saved and 205 tonnes of waste avoided

Client: Linkcity France (supported)

Architect: TVK

Delivery: 2021

Location: Paris 19th arrondissement

Program: Housing, Shops and Offices

petit st vincent de paul_edited.jpg

Petit - Zac Saint-Vincent-de-Paul

Mission: circular economy: integration of reused and recycled materials into buildings

Client: RIVP

Architect: Plan Común
Location: Paris 14th arrondissement

Delivery: 2023
Surface area: 12,500 m²
Program: Construction of 186 housing units

image_2021-10-13_121308_edited.jpg

Safran Malakoff

Mission: Supply of 6,105 m² of flooring slabs

Equivalence: 120 tonnes of CO2 saved and 170 tonnes of waste avoided

Client: Safran

Architect: STUDIOS architecture Paris

Delivery: 2021

Location: Malakoff

Program: Offices

autre soie iufm villeurbanne nb.jpg

Autre Soie

Mission: project management; Resources diagnosis / MASTER PLAN / Follow-up of dismantling/removal work / Integrating reuse into the construction project
Client: EMH Est Métropole Habitat
Architects: A-MAS
Delivery: 2023
Location: Villeurbanne 
Program: Housing and third places

morland_edited.jpg

Morland

Mission: Supply of 2,900 m² of flooring slabs

Equivalence: 87 tonnes of CO2 saved and 96 tonnes of waste avoided

Client: Bouygues Bâtiment Ile-de-France

Architect: David Chipperfield Architects + CALQ Architecture

Location: Paris 4th arrondissement

Program: Housing, Shops, Cultural spaces

BLAAACK_edited.jpg

Blaaack

Mission: Feasibility study for integrating reused products.

Procurement of used products

Client: REDMAN
Architect: ECDM
Program: Offices
Location: Clichy
Surface area: 50,000 m²
Certification: BREEAM, NF HQE

Innolin nb.jpg

Innolin

Mission: Supply of 2,800 m² of flooring slabs

Equivalence: equivalent of 84 tonnes of CO2 saved and 84 tonnes of waste avoided

Client: SPIE Batignolles

Architect: TVK

Location: Mérignac

Program: Offices

Python-Duvernois 1200x750_edited.jpg

Python Duvernois Porte de Bagnolet

Mission: Project management of the reuse of materials: waste diagnosis, resource diagnosis with conservation master plan track.

Client: RIVP
Demolition project management: SAFEGE
Program: Demolition of 2 apartment blocks
Location: 23 to 29 and 31 to 43 rue Henri Duvernois
Surface area: 10,650 m²

aphp paris 12 nb.jpg

AP-HP

Mission: Supply of 7,500 m² of flooring slabs

Equivalence: equivalent of 225 tonnes of CO2 saved and 225 tonnes of waste avoided

Client: Campenon Bernard Construction

Architect: Chartier-Dalix

Location: Paris 12th arrondissement

Program: Hospital

Doudeauville_edited.jpg

Doudeauville

Mission: Reuse project owner support: resource diagnosis, master plan

Project owner:  RIVP
Location: Paris 18th arrondissement
Surface area: 1,400 m²

Program: Building rehabilitation

Biome nb.jpg

Biome

Mission: Supply of 9,000 m² of flooring slabs

Equivalence: 270 tonnes of CO2 saved and 270 tonnes of waste avoided

Client: Bouygues Bâtiment IDF

Architect: YMA, Jouin Manku

Location: Paris 15th arrondissement

Program: Offices

VRD-Lampadaire_edited.jpg

Feugrais

Project owner: EBS Habitat
Demolition project management: Safège
Program: Housing demolition
Location: Rouen
Surface area: 17,600 m²
Mission: Project management of the reuse of materials: waste diagnosis, resource diagnosis with master plan track.

Miollis.jpg

Miollis

Project owner: UNESCO
Architect: Patriarche
Program: Renovation of Building V - Miollis site
Location: Paris 15th arrondissement
Surface area: 37,000 m²
Mission: Reuse project owner support: resource diagnosis, master plan, site tracking, social and environmental assessment.
Certification: BBC Rénovation

Gaumont_edited.jpg

Gaumont

Mission: Reuse project owner support: resource diagnosis, master plan, site tracking, social and environmental assessment.

Client: AG2R La Mondiale
Architect: Sisto
Demolition project management: Artelia
Location: Montreuil
Surface area: 20,000 m²

Program: Restructuring of an office building

Trapet_edited.jpg

Trapet

Mission: Reuse project owner support: resource diagnosis, master plan, site tracking, social and environmental assessment.

Client: Batipart
Location: Paris 13th arrondissement
Surface area: 9,000 m²

Program: Office renovation

Capture d’écran 2019-10-23 à 14.35.47.png

Ville de Paris

Mission: technical and methodological study for the City of Paris, to help it formalise reuse in its strip out-demolition and construction contracts.

Client: DCPA

Delivery: 2019

Location: Paris

Program: Research & Development

5_COURCELLE.png

Courcelles

Mission: Resource inventory

Client: Covéa

Delivery: 2018

Location: Paris

Program: Offices

Phase: Execution

6_MENILMONTANT.png

Ménilmontant

Mission: Resource inventory

Client: Paris Habitat

Delivery: 2018

Location: Paris

Program: Housing

Phase: APD

7_NORD PONT.png

Nord Pont

Mission: Resource inventory and identification of disposal outlets

Client: Covéa

Delivery: 2017

Location: Paris

Program: Office building

Phase: Construction Documentation (DCE)

Blanchemaille2_edited.jpg

Blanchemaille

Mission: Reuse project owner support: resource diagnosis, master plan, site tracking, social and environmental assessment. Search for off-site deposits.

Client: SEM Villle Renouvelée (MEL)

Delivery: 2024

Location: Roubaix

Program: euratechnologies cluster of excellence and innovation

Phase: Study

tour triangle nb.jpg

Tour Triangle

Mission: Reuse project owner support Feasibility study for integrating products from reuse, normative, insurance and implementation protocols. Search for off-site deposits

Client: Poste Immo

Delivery: 2026

Location: Paris 15th arrondissement

Program: Offices, shop

Phase: Study

zac des musiciens nb.jpg

ZAC des Musiciens

Mission: As part of the SD project owner support team, reuse project owner support. Establishment of guidelines, carbon footprint, lot sheets and analysis of future design projects.

Client: SADEV 94 CITALLIOS

Delivery: 2024

Location: Bagneux

Program: Housing development, Shops

Phase: Study

zac ivry confluence nb.jpg

ZAC Ivry Confluence

Mission: Reuse project owner support with AREP and Zefco. Implementation of the WEEE diagnosis on all existing sites. Implementation of a circular economy strategy applicable to the whole development zone. Definition of the operation and design of a reuse centre.

Client: SADEV 94

Delivery: 2024

Location: Ivry sur Seine

Program: Mixed-use program

Phase: Study

cassan nb.jpg

Barre Cassan

Mission: Reuse (on-site, off-site) of materials from building rehabilitation (WEEE diag., master plan, collaborative removal days, strip out/demolition/renovation site tracking)

Client: RIVP 

Delivery: 2024

Location: Paris 5th arrondissement

Program: Student accommodation

Phase: Study

rentiers nb.jpg

Rue des Rentiers

Mission: Reuse project owner support: resource diagnosis, master plan, site tracking, social and environmental assessment.

Client: SCI CHADESRENT - BATIPART / ARC Project 

Delivery: 2022

Location: Paris 13th arrondissement

Program: Office renovation

Phase: Design

unesco-v-500.jpg

Unesco

Mission: Project owner support to promote the reuse of materials. Mission: Reuse project owner support: resource diagnosis, master plan, site tracking, social and environmental assessment.

Client: UNESCO 

Delivery: 2024

Location: Paris 15th arrondissement

Program: Renovation of Building V - Miollis site

Phase: Project owner support to promote the reuse of materials

8_MOONWALK.png

Moonwalk

Mission: Collection of reuse materials

Client: ICADE

Delivery: 2018

Location: Aubervilliers

Program: Construction of a breezeway

Phase: Competition

bottom of page